A piece of the city · City planning

The lane was rezoned, and nothing was built

The land behind your street stopped being leftover.

You assume the lane is the back of everything. The lots along it carry a permission: since Council adopted the citywide amendments in July 2019, the zoning by-law permits a laneway suite on a residential lot that backs onto a public lane, if the suite meets the by-law's rules. No rezoning, no hearing, no case to make.

Piece 02 · City planning · 4 min read · By

the street house house house house house back yards the lane a suite Every garage here sits on land that carries a second permission. Permitted citywide since 16 July 2019, in R, RD, RS, RT and RM zones.
01

What as of right means

A permission that is already granted, and that nobody has to apply for.

Most changes to a residential property need an application, a fee, a notice to the neighbours and a decision. Occasionally the City writes the permission into the by-law instead, so a use becomes allowed everywhere it fits. No hearing, no committee, no case to make. A building permit is still needed; the argument is not.

That is what happened to the lots along the lanes. The rule stopped being a favour you ask for and became a right the land already carries.

02

What changed, and when

The City adopted it in two steps. On 28 June 2018 Council permitted laneway suites in R zones in the Toronto and East York district. On 16 July 2019 it extended the permission across the city, in R, RD, RS, RT and RM zones.

The work behind it was a City study, Changing Lanes, an examination of what the lane network could hold beside the houses already there.

Instrument
City of Toronto, amendments to the Official Plan and Zoning By-law 569-2013 for laneway suites: Toronto and East York, 28 June 2018; citywide, 16 July 2019
Scope
Residential lots in R, RD, RS, RT and RM zones that share a property line with a public lane; permitted by the by-law, subject to its criteria
Status
Public. The City publishes both the policy and the study
Standing
Dates as the City publishes them on its Changing Lanes page
03

The lane behind your own block

Nothing about this is visible from the street, which is why it stayed invisible. The lane is the back of everything, it carries the garages, and it is the one piece of land on the block whose rules changed without anything being built.

A permission is not a project. It changes what can happen beside you, and it changes what anyone buying on your block is buying. Which is why the garages are worth a walk.

The lane did not change. The permission on it did.

04

What to look at, on your own lane

A walk you have almost certainly never taken.

Do this on your own block
  1. Walk to the lane behind your street and turn around, so you are facing the back of the houses.
  2. Count the garages. Each one is a structure on land that now carries a second permission.
  3. Note which ones already have a door facing the lane, and how close they sit to the yard behind them.
  4. Ask how you would find out if one were rebuilt. A suite that meets the by-law needs a building permit, not a public hearing.
  5. Read the two together. The lane is where your block's capacity was decided, at a Council meeting few people on the block would have followed.

The type decides where the lane sits in your own life. A condominium owner has no lane; the equivalent is the site's own zoning, fixed when the building was approved, which is why change there arrives by application rather than by right. A semi usually shares the lane with its neighbour, which is why a suite there is a conversation with next door before it is a permit. A detached house is the clearest case: one lot, one garage, one permission that did not exist a decade ago. A loft building is the older version of the same story: its conversion usually needed a planning approval of its own, and its lane faces are still where the trucks went.

The type changes what your own block's equivalent is. It does not change what an as-of-right permission does to the land under it.

05

Why we send this

A street's future is decided in instrument after instrument, and almost none of them are announced in a way anyone living there would notice. A lane that quietly became buildable is the clearest example of the pattern.

So we read the record. One thing about how this city is actually put together, in enough detail that you can check it yourself and get the same answer. No figures we cannot source, no forecasts, nothing that expires in a fortnight.

How you can benefit from this: reading what a street is permitted to become before anyone argues about what it is worth.

· Realtor® · RARE Real Estate Brokerage · 416spaces.com

Not advice. Nothing here is planning or legal advice, and nothing here says a suite will be built or may be built on any particular lot: the permission and the site conditions are separate questions. The diagram is schematic and describes no real block. No figure in this piece is a price.